---
title: "Eduard Bernstein 11"
canonical: https://ganeden.xyz/project/eduard-bernstein-11-tel-aviv
published: 2026-07-02T21:50:30.000Z
modified: 2026-07-09T13:31:13.396Z
---
# Eduard Bernstein 11
Nom local : אדוארד ברנשטיין 11

- Statut : Nouveau programme
- Adresse : Eduard Bernstein St 11, Tel Aviv-Yafo
- Quartier : Old North
- Logements : 14
- Permis de construire : juin 2026
- Livraison : juin 2028
- Promoteur : כרם (ר.ו.) - יזמות והתחדשות עירונית בע"מ
- Registre des sociétés : 512506759

A boutique TAMA 38/2 residence of 14 apartments on a quiet street in the Old North of Tel Aviv-Yafo, minutes from Ben Yehuda, the Gordon Pool and the marina. Homes range from 46 to 100 square meters, with sun balconies, private gardens, central air conditioning and robotic parking. Developed by Kerem Urban Renewal, permit approved June 2026.

## Le programme

Eduard Bernstein 11 rises on a quiet, tree-lined street in the Old North of Tel Aviv-Yafo, a few minutes on foot from Ben Yehuda and Arlozorov streets. The project replaces an older building through a full TAMA 38/2 demolition and reconstruction, delivering a boutique residence of 14 apartments across six floors.

The mix runs from compact 2-room homes of about 46 square meters to 4-room apartments of 100 square meters on the ground floor, with 2.5-room and larger 4-room layouts on the upper levels. Units 13 and 14 can be combined into a single 197 square meter penthouse. Every apartment is planned for cross ventilation and multiple exposures, with sun balconies, a private garden for the ground-floor homes, central air conditioning controlled room by room, and robotic parking below the building.

The developer, Kerem (R.V.) Urban Renewal, is a family-owned firm led by CEO Roni Weinberg with four generations in Israeli real estate and thousands of residential and commercial units built. Kerem concentrates on TAMA 38 and pinui binui projects in the Tel Aviv city center; the architecture here is by Kazor-Ronen. Project financing is arranged through the group's finance arm, M.U. Investments, alongside Israeli banks and institutional investors.

The building permit was approved on 24 June 2026, and construction is scheduled to run through 2028. Seven of the 14 apartments remain available at the time of writing, and sales run directly through Kerem's office at 82 Begin Road, Tel Aviv-Yafo.

## Prestations

- TAMA 38/2 demolition and reconstruction
- Robotic parking
- Sun balconies with multiple exposures
- Central air conditioning with per-room control
- Electric shutters and blinds
- Designer entrance doors
- Luxury fitted kitchens
- Designed lobby and public spaces
- Private garden apartments on the ground floor
- Reinforced safe room in every apartment

## À proximité

- Ben Yehuda Street, 2 min walk
- Arlozorov Street, 3 min walk
- Dizengoff Street, 5 min walk
- Nordau Boulevard, 6 min walk
- Gordon Swimming Pool, 8 min walk
- Gordon Beach, 10 min walk
- Tel Aviv Marina, 10 min walk
- Kikar HaMedina, 12 min walk

## Contact bureau de vente

- Téléphone : 03-6121314
- Email : office@keremltd.co.il
