---
title: "David Yalin 16, Tel Aviv-Yafo"
canonical: https://ganeden.xyz/project/israel/telaviv/david-yalin-16-tel-aviv
published: 2026-08-20T17:16:56.000Z
modified: 2026-08-20T17:18:18.114Z
---
# David Yalin 16, Tel Aviv-Yafo
Nom local : דוד ילין 16, תל אביב-יפו

- Statut : En construction
- Adresse : David Yalin St 16, Tel Aviv-Yafo
- Quartier : New North, Kikar HaMedina
- Logements : 26
- Permis de construire : avril 2026
- Livraison : avril 2028
- Promoteur : Kedar Buildings Ltd
- Registre des sociétés : 510605520

Twenty six homes approved on 19 April 2026 at David Yalin 16, a boutique seven storey building by Kedar Buildings, five minutes on foot from Kikar HaMedina. The mix runs from three to five room apartments through garden apartments, mini penthouses and penthouses, each with underground parking and a storage unit.

## Le programme

David Yalin 16 stands in the New North, the residential grid that wraps around Kikar HaMedina in central Tel Aviv. The square is a five minute walk east, Ibn Gabirol Street and its cafes are five minutes west, and the Basel Street strip is seven minutes north. Municipal records place the address in statistical zone 421 of the New North, Kikar HaMedina area, where the average building dates from 1970. The project is a TAMA 38/2 urban renewal scheme: the existing block comes down and a new building rises in its place.

Kedar Buildings is developing the project with Zait Lev Architects. The building permit approved on 19 April 2026 covers 26 apartments, and the developer markets the finished building as 27 homes on seven floors. The published mix runs from three and four room apartments to five room apartments, garden apartments, mini penthouses and penthouses. Kedar Buildings was founded in 1965 by Avraham Kedar and builds mainly in the Sharon region, with urban renewal projects in Tel Aviv.

Every apartment carries at least one underground parking space and a private storage unit, and the kitchens are specified with premium appliance suppliers. The renderings published by the developer show deep recessed balconies stacked along two elevations, planted terraces on the upper floors, a pergola over the penthouse level, and a ground floor set back behind landscaped planters. Each apartment plan includes a mamad, the reinforced safety room required by Israeli code.

The permit is the only published date in the file. Everything after it on this page, from the close of the appeals window to a spring 2028 delivery, follows the standard Israeli urban renewal schedule and is a projection, not a commitment published by Kedar Buildings. Prices are not public. The developer takes enquiries on 1-700-504514 and at office@kedar-mivnim.com.

## Prestations

- Underground parking space and storage unit with every apartment
- Designer kitchens specified with premium appliance suppliers
- Three, four and five room apartments, garden apartments, mini penthouses and penthouses
- Single boutique building of seven floors, 27 homes marketed
- TAMA 38/2 urban renewal, demolition of the existing block and rebuild
- Mamad reinforced safety room in every apartment plan
- Deep recessed balconies and planted upper floor terraces
- Pergola shaded penthouse level
- Landscaped ground floor set back from the street

## À proximité

- Kikar HaMedina, 5 min walk
- Ibn Gabirol Street shops and cafes, 5 min walk
- Basel Street cafe strip, 7 min walk
- Rabin Square, 12 min walk
- Tel Aviv Sourasky Medical Center (Ichilov), 12 min walk
- Tel Aviv Museum of Art, 15 min walk
- Hayarkon Park, 15 min walk
- Savidor Center railway station, 1.5 km east

## Contact bureau de vente

- Téléphone : 1-700-504514
- Email : office@kedar-mivnim.com
