The two Paran 4 buildings seen from the green slope, Jerusalem stone facades above the street
Dusk view of the Paran 4 corner facade in Ramat Eshkol, with planted balconies and ground floor shopfronts

New developmentRamat Eshkol

Paran 4, Jerusalem

פארן 4, ירושלים

Delivery 2028200 homes

WhatsApp
Discover
homes
200
permit approved
Jun 2026
delivery
2028

The project

Urban renewal in the heart of Ramat Eshkol, opposite the commercial centre

Paran 4 occupies the plot facing the Ramat Eshkol commercial centre, and its building permit was approved on 16 June 2026 under urban renewal plan 101-1225895. The permit record registers 63 homes on the site, which are the apartments of the five storey block standing there today, and the national planning register authorises 200 homes on the plot under the approved plan. Under the approved pinui binui plan that block is demolished and two mixed use buildings of 11 storeys take its place, holding 181 homes on a site of about 4.2 dunam.

The ground floors carry the programme that ties the project to the neighbourhood: about 4,000 sqm of retail, a public building, and a pedestrian link down to the valley and the green areas below the plot. Four levels of underground parking sit beneath the two buildings. The approved visualisations show facades clad in Jerusalem stone, balconies deep enough to plant on every residential floor, pergolas over the top storey terraces and a line of shopfronts along the street corner.

Capital Gold is the developer. The Jerusalem company has delivered dozens of TAMA 38 projects, on the strengthening track and on the demolition and rebuild track, and now concentrates on large scale pinui binui. Its record in the area includes Ma'avar HaMitla 3 in Ramat Eshkol, 49 homes near the light rail axis, Yirmiyahu 36 in Romema, 56 homes with retail space, and Yisa Bracha 13 in the Bukharim quarter, 34 homes with retail, occupied in 2017. Avraham Gottesman and Elazar Elyakim own and manage the company with Israel Bornstein. The renderings were produced by Studio Pitom.

The timeline below is anchored on the permit date of 16 June 2026. On the standard Israeli sequence the appeal window closes around September 2026, works start around October 2026, the structure reaches weather tight cover in mid 2027, finishing works run through early 2028 and handover falls in June 2028. These dates are calculated from the approval, and the developer has not published a schedule of its own. No price list, apartment mix or sales office has been published for Paran 4 yet, and those details will be added here as Capital Gold releases them.

The addressParan St 4, Ramat Eshkol, Jerusalemרחוב פארן 4

The two Paran 4 buildings seen from the green slope, Jerusalem stone facades above the street
Dusk view of the Paran 4 corner facade in Ramat Eshkol, with planted balconies and ground floor shopfronts
Street frontage of Paran 4, with the pedestrian passage between the two wings and the retail level

Timeline

From permit to keys

Currently: construction start, Oct 2026

  1. Mar 2026Sales launch
  2. Jun 2026Building permit
  3. Sep 2026Appeals cleared
  4. Oct 2026Construction startWe are here
  5. Jun 2027Structure complete
  6. Feb 2028Finishing works
  7. Jun 2028Delivery

Features

Why Paran 4

  • Urban renewal plan 101-1225895, permit approved on 16 June 2026
  • Two mixed use buildings of 11 storeys, 181 homes on a 4.2 dunam site
  • About 4,000 sqm of ground floor retail facing the Ramat Eshkol commercial centre
  • Four levels of underground parking
  • Public building and a pedestrian link to the valley and its green areas
  • Jerusalem stone facades with planted balconies on every residential floor
Talk to an advisor

Location

Ramat Eshkol

Jerusalem, Jerusalem District

The address

Paran St 4, Ramat Eshkol, Jerusalem

רחוב פארן 4

Get directions

Around the address

  • Ramat Eshkol commercial centredirectly opposite
  • Givat HaMivtar400 m walk
  • Ammunition Hill light rail stop on the Red Line700 m walk
  • Ammunition Hill memorial site800 m walk
  • French Hill800 m walk
  • Sanhedria Tombs Park1.3 km
  • Hebrew University Mount Scopus campus2 km
  • Hadassah Mount Scopus Hospital2.2 km

The developer

Capital Gold

Jerusalem developer active in urban renewal. Capital Gold has delivered dozens of TAMA 38 projects, on the strengthening track and on the demolition and rebuild track, and now focuses on large scale pinui binui. Delivered projects include Yisa Bracha 13 in the Bukharim quarter, 34 homes with retail, occupied in 2017, Yirmiyahu 36 in Romema, 56 homes with retail on the light rail axis, and Ma'avar HaMitla 3 in Ramat Eshkol, 49 homes. The company is owned and managed by Avraham Gottesman and Elazar Elyakim with Israel Bornstein.

  • Capital Gold
  • Studio Pitom

The essentials

Paran 4, Jerusalem, in facts

Address
Paran St 4, Jerusalem
Neighborhood
Ramat Eshkol
District
Jerusalem District
Status
New development
Homes
200
Building permit
Jun 2026
Delivery
Jun 2028
Developer
Capital Gold

Contact

Interested in Paran 4?

Receive the full brochure: floor plans, availability and pricing.

Request the brochure