- homes
- 5
- permit approved
- May 2026
- delivery
- 2028
The project
Yavetz 27, Tel Aviv-Yafo
Yavetz 27 brings 5 new homes to Lev Ha'ir, the historic core of Tel Aviv-Yafo, on a short residential street running between Nahalat Binyamin and the Carmel Market. The Tel Aviv-Yafo local planning committee approved building permit 20242282 on 10 May 2026, and that approval sets the construction calendar for the whole project.
The approved design follows the White City vocabulary of the surrounding streets. The street elevation is white render, articulated by a central bay of stacked porthole windows and by projecting balconies with dark metal railings serving every apartment. The rear elevation switches to board formed exposed concrete, and the top floor steps back behind a planted roof terrace shaded by a steel pergola. A lift core rises the full height of the building to that roof level. At street level the entrance sits behind a planted forecourt enclosed by a low white garden wall.
The address puts daily life within a few minutes on foot. The Carmel Market is a 5 minute walk and the Nahalat Binyamin crafts mall and Magen David Square are closer still. Allenby Street runs one block away with its bus routes toward the north of the city and toward Jaffa. Rothschild Boulevard is about a 9 minute walk and the Jerusalem Beach promenade about 10 minutes, while Kerem HaTeimanim and Neve Tzedek sit immediately to the west and south.
Construction is scheduled to follow the permit directly. Works are expected to start around September 2026, with the structure weather tight during 2027, finishing works through the first months of 2028 and delivery in 2028. With only 5 apartments in the building, the project suits buyers who want a new-build home with contemporary systems on a street that has kept its low-rise scale.
The addressYavetz St 27, Lev Ha'ir, Tel Aviv-Yafoיעב"ץ 27
Timeline
From permit to keys
Currently: construction start, Sep 2026
- Feb 2026Sales launch
- May 2026Building permit
- Aug 2026Appeals cleared
- Sep 2026Construction startWe are here
- May 2027Structure complete
- Jan 2028Finishing works
- May 2028Delivery
Features
Why Yavetz 27
- Boutique building of 5 apartments
- Private balcony for every apartment
- Setback top floor with a planted roof terrace and steel pergola
- White render street facade with a bay of stacked porthole windows
- Board formed exposed concrete rear elevation
- Planted ground floor forecourt behind a low white garden wall
- Lift core serving every floor up to the roof terrace
- New construction under building permit 20242282, approved 10 May 2026
Location
Lev Ha'ir
Tel Aviv-Yafo, Tel Aviv District
Around the address
- Allenby Street2 min walk
- Nahalat Binyamin pedestrian mall4 min walk
- Magen David Square4 min walk
- Carmel Market5 min walk
- Sheinkin Street7 min walk
- Rothschild Boulevard9 min walk
- Jerusalem Beach and the Herbert Samuel promenade10 min walk
- Neve Tzedek12 min walk
The essentials
Yavetz 27, Tel Aviv-Yafo, in facts
- Address
- Yavetz St 27, Tel Aviv-Yafo
- Neighborhood
- Lev Ha'ir
- District
- Tel Aviv District
- Status
- New development
- Homes
- 5
- Building permit
- May 2026
- Delivery
- May 2028
Contact
Interested in Yavetz 27?
Receive the full brochure: floor plans, availability and pricing.