New developmentKiryat HaYovel
Shmaryahu Levin 9, Jerusalem
שמריהו לוין 9, ירושלים
Delivery 202832 homes
- homes
- 32
- permit approved
- Jun 2026
- delivery
- 2028
The project
Shmaryahu Levin 9, Jerusalem
Jerusalem approved the building permit for Shmaryahu Levin 9 on 16 June 2026 under file 101-1282235. The permit covers the demolition of the building standing on the plot and the construction of a new residential building in its place. The renderings filed with the permit show a slim tower clad in Jerusalem stone, with planted balconies recessed into the street facade on every residential floor. Full height glazing wraps the corner above a glazed ground floor, and a timber pergola shades the set back top floor terrace.
The address sits at the Mount Herzl end of Shmaryahu Levin Street, in Kiryat HaYovel in southwest Jerusalem. The Shmaryahu Levin light rail stop stands 60 m from the door, Kiryat HaYovel West 370 m away and the Mount Herzl interchange 450 m away. Mount Herzl National Memorial and Yad Vashem both lie about 550 m from the plot. Hadassah Ein Kerem Medical Center is 2.6 km to the southwest and Malha Mall 2.3 km to the southeast.
Kiryat HaYovel is one of the neighbourhoods Jerusalem is rebuilding along its light rail corridor. N12 reported in January 2022 that roughly 2,500 homes in the neighbourhood were already under construction or held final approval, with several thousand more expected over the following two decades, and that three light rail stops serve it: Shmaryahu Levin, Kiryat HaYovel West and Henrietta Szold East. The same report put prices between 22,000 and 24,000 shekels per square metre in the southern part of the neighbourhood and between 26,000 and 30,000 shekels in the north.
Construction has not started. The timeline below is anchored on the permit date of 16 June 2026. On the standard Israeli sequence, the appeal window closes around September 2026, works begin around October 2026, the structure reaches weather tight cover in mid 2027, finishing works run through early 2028, and handover falls in June 2028. These milestones are calculated from the approval date. The developer has not published a schedule of its own. No sales site, price list or apartment mix has been released for this address yet, which is the normal picture at this point in the cycle, because an Israeli permit is often approved months before a developer opens sales.
The addressShmaryahu Levin St 9, Kiryat HaYovel, Jerusalemרחוב שמריהו לוין 9
Timeline
From permit to keys
Currently: construction start, Oct 2026
- Mar 2026Sales launch
- Jun 2026Building permit
- Sep 2026Appeals cleared
- Oct 2026Construction startWe are here
- Jun 2027Structure complete
- Feb 2028Finishing works
- Jun 2028Delivery
Features
Why Shmaryahu Levin 9
- Building permit approved on 16 June 2026, file 101-1282235
- Existing building on the plot demolished and replaced
- Jerusalem stone cladding with timber panelled recesses
- Planted balconies recessed into the street facade on every residential floor
- Full height glazing wrapping the corner of the building
- Timber pergola over the set back top floor terrace
- Landscaped ground floor terrace on Shmaryahu Levin Street
- Shmaryahu Levin light rail stop 60 m from the entrance
Location
Kiryat HaYovel
Jerusalem, Jerusalem District
Around the address
- Shmaryahu Levin light rail stop60 m walk
- Alliance (Kol Yisrael Haverim) school170 m walk
- Kiryat HaYovel West light rail stop370 m walk
- Mount Herzl National Memorial550 m walk
- Mordot HaGan swimming pools550 m walk
- Yad Vashem World Holocaust Remembrance Center10 min walk
- Malha Mall2.3 km
- Hadassah Ein Kerem Medical Center2.6 km
The essentials
Shmaryahu Levin 9, Jerusalem, in facts
- Address
- Shmaryahu Levin St 9, Jerusalem
- Neighborhood
- Kiryat HaYovel
- District
- Jerusalem District
- Status
- New development
- Homes
- 32
- Building permit
- Jun 2026
- Delivery
- Jun 2028